Metal Building Roof Coating: Uses, Preparation, and Care

Writer: Brett Foisie
Brett Foisie
20 hours ago
19 min read

A metal building roof coating can be useful when the existing roof is structurally sound but needs a compatible protective surface or renewed weathering layer. It is not a shortcut for correcting loose panels, failed fasteners, open seams, trapped moisture, or damaged framing. Texas owners should start with the roof's condition, the panel and finish type, and the problem they are trying to solve—not with a coating label or a promise on a product bucket.

What can a metal building roof coating do?

A roof coating is a liquid-applied layer placed over a prepared existing roof. Depending on the coating chemistry and the roof assembly, it may provide a continuous weathering surface, help protect compatible roof materials from exposure, or improve reflectance. The exact benefits depend on the product, the substrate, the condition of the existing roof, and whether the application follows the manufacturer's instructions.

That distinction matters. A coating is not a new roof system, a structural reinforcement, or a universal leak repair. It cannot restore corroded-through steel, tighten an under-designed connection, correct poor drainage, or make a failing roof suitable simply by covering it. If water is entering at a seam or fastener, the source needs to be identified and repaired using an approach appropriate to that roof before a coating plan is considered.

For some owners, the aim is to extend the useful service of a sound roof with a compatible maintenance treatment. Others are responding to surface chalking, faded finish, recurring minor water entry, or a desire to change roof reflectance. Those are different situations and require different inspections and specifications. First identify the goal; then ask whether a coating is a sensible response.

Metal roofs are assemblies, not just visible sheets. They include panels, side and end laps, fasteners, washers, flashing, ridges, valleys, eaves, penetrations, gutters, and sometimes insulation or an existing coating. Water can move beneath the visible surface and show up far from its entry point. A suitable roof assessment looks at the whole assembly rather than proposing a blanket layer over every surface.

When is a coating worth considering?

A coating may be worth evaluating when the roof panels and supporting structure remain serviceable, the existing surface can be prepared, and the intended coating is approved for the substrate. It may also be an option when a building owner wants to compare maintenance treatments with localized repairs or a broader roof replacement. A site-specific assessment helps make that comparison practical.

Look for patterns rather than relying on one stain or one view from the ground. Discoloration alone does not prove a roof is leaking, and a ceiling stain does not identify the entry point. If the finish is weathered but the metal remains intact, the issue differs from a roof with recurring leaks, corroded edges, loose panels, or widespread coating separation. A coating recommendation should describe what was observed and how the proposed work addresses it.

  • Potential coating candidate:

    Panels are stable, the metal is not perforated, drainage works, and needed repairs are limited and identifiable.

  • Needs repair before a coating decision:

    Loose fasteners, open seams, failed sealant, damaged flashing, or a localized leak path is present.

  • May need a different roof solution:

    There is widespread corrosion, repeated water intrusion, extensive delamination, movement, or damage to the roof structure.

These are screening categories, not a substitute for an inspection. A roof can have more than one condition at once. For example, panels may be generally sound while a ridge flashing detail and several fastener lines need focused work. Conversely, a roof that looks acceptable from a distance may have deteriorated washers, hidden moisture, or damage near penetrations.

If the building is being used for equipment, inventory, livestock, or business operations, consider what a failure would affect. The consequences of water entry, access restrictions, and work scheduling can influence whether the right next step is a repair, coating evaluation, or replacement plan. Do not let the desire for the least disruptive short-term choice obscure the condition of the roof.

What should you inspect before choosing a product?

Begin with the roof identity. Record the building's location, approximate age if known, panel profile, visible finish, past repairs, and any existing coating. Gather available plans, invoices, maintenance records, and product information. If the original panel or coating manufacturer is known, that can help determine compatibility. Do not assume that a coating formulated for one roof type is suitable for another.

Inspect the roof from a safe position. Metal roofs can be slick, fragile in places, and unsafe to access without proper fall protection and training. An owner should not climb onto a roof just to take a closer look. A qualified construction professional can plan access and inspection in a way that accounts for roof slope, height, openings, weather, and the condition of the panels.

A practical inspection records the condition of these areas:

  • Panel surfaces:

    Look for rust, pitting, punctures, dents, peeling finish, chalking, scratches, or areas where dissimilar materials or prior repairs meet.

  • Side and end laps:

    Check for separation, failed sealant, movement, debris, and evidence of water tracking along panel joints.

  • Fasteners and washers:

    Note missing, backed-out, corroded, or damaged fasteners and hardened or split washers. A coating should not simply conceal a fastener problem.

  • Ridges, eaves, valleys, and transitions:

    These locations collect water or connect different roof details. Check flashing, closure materials, edges, and signs of repeated wetting.

  • Penetrations and attachments:

    Document vents, curbs, pipes, equipment supports, and other openings. Each needs a compatible, detailed treatment rather than a casual brush-over.

  • Drainage:

    Look for standing water, blocked gutters, debris, or conditions that direct runoff back toward a seam or wall.

  • Interior evidence:

    Note ceiling stains, damp insulation, corrosion on the underside, odors, or water entry observed during or after rain.

Photographs are useful when they show location and context. Take ground-level images of each roof plane, then document specific details from a safe access point if one is available. Mark a simple roof sketch with the locations of leaks, repairs, and ponding. This record helps a contractor distinguish isolated defects from a widespread condition and makes it easier to compare proposals on the same scope.

For a broader picture of repair decisions, see the guide to when to call a metal building repair contractor. Roof work may also connect to the building's existing fastener condition; the metal building fastener replacement guide explains why fasteners should be treated as part of the roof assembly, not as incidental hardware.

How do common coating types differ?

Product names alone are not enough to select a coating. Acrylic, silicone, polyurethane, asphalt-based, and aluminum-pigmented products have different properties, application requirements, and substrate limitations. Formulations vary, so confirm the current product data sheet, preparation instructions, approved uses, and written warranty terms for the specific material under consideration.

Coating family

Typical selection question

What to verify for a metal roof

Acrylic

Is a water-based coating appropriate for the roof's exposure and drainage?

Confirm compatibility with the metal finish, required dry conditions, seam treatment, and whether the product is intended for the roof's water exposure conditions.

Silicone

Does the product suit the roof's drainage pattern and maintenance plan?

Check approved substrates, surface preparation, adhesion requirements, detail treatment, and how future repairs or recoating should be handled.

Polyurethane

Is abrasion or impact resistance a relevant consideration for this project?

Verify the specific product's roof use, primer requirements, compatibility, application method, and any protective topcoat requirements.

Asphalt-based

Is the formulation expressly suitable for the existing metal roof and finish?

Confirm metal-substrate approval, compatibility with existing materials, intended service conditions, and the manufacturer's limitations.

Aluminum-pigmented

Is a reflective maintenance finish the actual goal?

Confirm the coating is intended for the roof material and condition, and understand its limits for seams, active leaks, and damaged metal.

This comparison is a starting point, not a product recommendation. Formulation can matter as much as the broad chemistry category. Two products in the same family can differ in primers, reinforcement requirements, thickness, application conditions, and accepted substrates. A contractor should name the proposed product and explain why it fits the observed roof.

Ask for the technical data sheet and safety information before approving work. Check whether the proposed system requires a primer, fabric or reinforcing material at seams, a particular number of coats, or a specified surface profile. Clarify whether the coating is intended for the entire roof, selected details, or a limited maintenance area. A generic description such as “elastomeric coating” does not answer those questions.

How should you compare coating with repair or replacement?

Choose the work that addresses the condition, not simply the option with the broadest coverage or the shortest description. A coating can make sense only if the existing roof is a suitable base. Repair is often the more direct response to a localized failed detail. Replacement may be more appropriate when the panels, connections, or supporting conditions have broad deterioration that a surface treatment cannot correct.

Ask each bidder to explain the condition found, the recommended scope, and the alternatives considered. A sound proposal should identify the problem areas, the work needed before coating, the coating system and preparation, exclusions, and the inspection or maintenance expectations. It should also state what conditions would change the recommendation once work begins.

Use questions like these in a comparison:

  • What roof material and existing finish did the inspection identify?

  • Where are the leak paths or failures, and what evidence supports that diagnosis?

  • Which repairs are included before coating, and which are excluded?

  • What product will be used, and is it approved for this exact substrate?

  • How will seams, fasteners, penetrations, edges, and transitions be treated?

  • What surface preparation and weather conditions are required?

  • What does the written warranty cover, and what maintenance or exclusions apply?

  • How will the crew protect access areas, stored property, gutters, and nearby equipment?

Do not compare a coating-only proposal with a proposal that includes repairs, flashing work, or drainage improvements as though they were identical scopes. If a proposal excludes correction of active leak sources, make sure that limitation is clear. A lower bid may reflect less preparation or fewer included details rather than a better value for the same result.

A coating is also not automatically the “green” or economical answer simply because it uses the existing roof. If repeated repairs are needed, the roof has extensive damage, or moisture has affected the assembly, continuing to cover the surface may defer rather than resolve the underlying issue. Compare expected work, disruption, and remaining uncertainty—not just the amount of roof surface treated.

What preparation does a metal roof need?

Preparation is a major part of a coating job. The coating must adhere to an acceptable surface, and any water entry or defective detail must be addressed according to the system requirements. Simply washing the roof and applying product over dirt, loose finish, rust, oil, or failed sealant can leave the underlying problem in place and interfere with adhesion.

The exact sequence depends on product instructions and roof condition. A contractor may need to remove loose material, clean and rinse the surface, allow it to dry, address corrosion, replace defective fasteners, repair seams or flashing, and apply a primer where required. Each step should be included in the scope, not left as an assumption.

  1. Confirm the substrate and existing layers.

    Identify painted or bare metal, galvanized surfaces, prior coatings, sealants, and repair materials. Ask whether adhesion testing or a small test area is appropriate.

  2. Remove contamination and loose material.

    The specified cleaning method should remove dirt, grease, chalking, and loose coating without damaging panels or driving water into the building.

  3. Treat corrosion properly.

    Loose rust and unsound metal need evaluation. Surface treatment cannot restore metal that has lost thickness or is perforated.

  4. Repair the roof details.

    Replace or correct failed fasteners, damaged flashing, open seams, penetrations, and other defects before applying the field coating when the system calls for it.

  5. Allow for drying and suitable conditions.

    Moisture, temperature, dew, wind, and forecast conditions can affect preparation and application. Follow the product's stated limits.

  6. Apply primer or reinforcement as specified.

    Treat transitions and seams using the system details, not an improvised layer intended to cover every defect.

  7. Check coverage and finish.

    Record the completed areas, coats, and any exceptions so the owner can plan inspection and future maintenance.

Pressure washing deserves particular care. A high-pressure stream aimed beneath panel laps, flashing, or damaged areas can push water where it should not go, and aggressive cleaning can damage a surface. The chosen equipment, pressure, nozzle, direction, and runoff control should suit the roof. Likewise, corrosion treatment and solvent use should follow the product directions and applicable site safety practices.

Ask how the crew will handle debris and wash water. Protect vehicles, landscaping, stored materials, and roof drainage. On a commercial or agricultural property, plan around deliveries, equipment movement, customers, employees, or livestock. A clear work plan can reduce disruption without suggesting that every roof or building can be treated in the same way.

How do Texas conditions affect the plan?

Texas weather makes timing and site conditions important. Strong sun and heat can affect surface temperature and how a product behaves during application. Humidity, overnight dew, rain, wind, and sudden weather changes can influence whether the roof is dry enough and whether the coating can cure as intended. The product instructions and actual roof conditions should control the work window.

Do not treat a regional climate description as a substitute for evaluating the site. A building near the Gulf Coast, an exposed rural site, and a shaded property may experience different combinations of wind-driven rain, salt or airborne contaminants, moisture, debris, and sun exposure. In East and Central Texas, drainage and runoff deserve attention alongside the coating choice. Water held against a seam or directed toward an opening can remain a problem regardless of the product applied.

Ask the contractor to explain how the schedule will respond to weather. What happens if rain is forecast before the product's stated cure period? How will the crew confirm the surface is ready? Will work pause if roof temperature or wind conditions are outside the product guidance? These are practical quality questions, not requests for an exact completion date before the roof and weather are assessed.

Also consider roof geometry and access. A wide, low-slope commercial roof, a steep roof over a shop, and a roof broken up by equipment or skylights present different access and detail conditions. The site plan should account for fall protection, safe material handling, equipment, and protection of openings. No coating selection removes the need for safe work practices.

Local permitting and project requirements depend on jurisdiction and scope. If the work includes more than surface maintenance—such as structural changes, replacement, or related site work—confirm applicable requirements with the responsible local reviewer and project professionals. The company's construction scope is project-specific; its Texas service-area information can help readers start a conversation about location and coverage rather than assume that every service is available everywhere.

Does a roof coating improve energy performance?

A reflective coating may change how much solar energy the roof surface absorbs, but a coating by itself does not determine the building's indoor comfort or energy use. Roof color, product reflectance, insulation, ventilation, air leakage, ceiling configuration, equipment, occupancy, and local conditions all play a part. The effect of a coating on a particular building cannot be promised from the product category alone.

If reflectance is the reason for considering a coating, ask for the product's published performance information and clarify what it measures. Confirm that the proposed color and system are available for the roof and appropriate to the project. Ask whether the roof assembly has insulation and ventilation issues that should be addressed separately. A roof coating does not replace a building-envelope assessment.

Keep the objective specific. “Make the building cooler” is not a complete specification. Is the concern high indoor temperatures in an occupied workspace, heat affecting stored products, or surface exposure? The answer may point to different measures. For planning the roof's other components, the company's steel roofing guide offers a related overview, while the Texas metal building ventilation guide covers a separate part of indoor air and heat planning.

Energy claims should be specific to a complete building and use case. Do not assume a coating will produce a particular utility-bill reduction, a fixed indoor temperature change, or a guaranteed payback. A building owner who needs an energy comparison can document existing roof and insulation conditions, operating hours, and utility use, then consult a qualified professional about the measures that apply to that building.

What should the scope and warranty say?

A clear scope describes what is being treated and what is not. It should identify the roof planes or areas, the coating product and system, preparation, repairs, seam and penetration details, application steps, and any required inspections. It should specify how the contractor will handle conditions discovered after cleaning or during the work. If an area is not accessible or is excluded, that needs to be stated plainly.

Ask for written answers on the following points:

  • Condition and basis:

    What did the inspection find, and what assumptions does the proposal make about the roof?

  • Materials:

    What product, primer, reinforcement, and sealant are included? Are substitutions allowed?

  • Preparation:

    What cleaning, corrosion treatment, and removal of loose material are included?

  • Repairs:

    Which fasteners, seams, flashing, and penetrations will be repaired, and how will additional findings be approved?

  • Application:

    What areas receive coating, how many application steps are specified, and what weather or surface conditions must be met?

  • Access and protection:

    How will the crew protect occupants, equipment, inventory, landscaping, and drainage?

  • Warranty:

    Who provides it, what does it cover, what exclusions apply, and what maintenance or recordkeeping is required?

  • Handoff:

    What product records, photographs, care instructions, and completion notes will the owner receive?

Read warranty terms rather than relying on a duration stated in a sales conversation. Coverage may depend on substrate condition, preparation, application, maintenance, drainage, or other listed requirements. Ask how leaks, adhesion problems, repair work, and coating wear are treated. Confirm whether the material manufacturer, contractor, or both are responsible for different parts of the written coverage.

Clarify change handling before work starts. For example, cleaning may reveal a panel opening or corrosion that was not visible from the initial inspection. The proposal should explain how the owner will be informed, how an added repair will be described, and how authorization will be obtained. No one should need to infer whether a critical repair was performed or merely covered.

How should you plan maintenance after application?

A coated roof still needs inspection. Maintenance is not a sign that the coating failed; it is how an owner finds debris, damaged details, or new problems before they spread. Follow the product's written maintenance guidance and keep the roof history with the building records.

After the work, retain the proposal, product data sheets, warranty documents, photographs, and notes on repairs. Record the application date and any conditions the contractor says need monitoring. Keep a simple roof plan showing penetrations, repaired seams, drains, and areas that were not included. This makes later inspections more useful and helps a future contractor understand the roof rather than guess at its history.

Schedule visual checks at intervals appropriate to the roof, building use, and product instructions, and after events that could have affected the roof. A qualified professional should assess any suspected damage or water entry. Look for:

  • Debris or vegetation that blocks drainage or holds moisture against the roof.

  • New scratches, impact marks, punctures, or areas of exposed substrate.

  • Changes at seams, fasteners, flashing, curbs, and other transitions.

  • Cracking, separation, blistering, or unusual wear in the coating, interpreted against the product guidance.

  • Water stains, damp materials, or recurring moisture inside the building.

Use care when cleaning or making minor repairs. The wrong cleaner, tool, sealant, or coating can harm the existing system or affect warranty terms. Do not apply a leftover product simply because it appears similar. Check the manufacturer's instructions and ask a qualified contractor to assess uncertain conditions, especially where water is entering or metal is deteriorating.

Keep gutters and drainage paths clear where they are part of the roof's water-management plan. Do not direct wash water or roof runoff toward an entrance, slab edge, neighboring property, or area where it can create another problem. If recurring ponding or runoff is observed, have the cause evaluated; applying more coating may not correct the slope or drainage condition.

When is repair or replacement a better choice?

Coating should not conceal a roof that needs more fundamental work. Widespread rust, perforations, loose or distorted panels, repeated leaks at multiple locations, damaged structural members, or signs of trapped moisture call for a careful evaluation. The right response may involve localized repairs, panel replacement, broader roof replacement, or other work based on the actual assembly and project requirements.

Pay attention to recurring failures. If the same area leaks after successive sealant or coating attempts, identify why it keeps failing. The source could involve movement, an incompatible repair, poor drainage, a flashing design, or water traveling from another point. A new surface layer without diagnosis can make the next assessment harder.

Likewise, a small leak does not automatically mean the whole roof needs replacement. A well-defined problem at one penetration or fastener line may be repairable. Request a written explanation of the extent and cause before committing to broad work. A useful contractor should be able to explain both the limits of a repair and the risks of leaving a larger condition in place.

Metal Buildings of Texas handles metal-building construction and related project scopes, including repairs and retrofits. Owners can review the repairs, expansions, and retrofits service page to understand the relevant service path, then discuss the particular roof and building rather than presume a coating is the right solution. For new or larger building work, the turnkey custom metal building information describes the broader coordinated construction approach.

How can you compare proposals fairly?

Gather proposals based on the same known roof information and ask each contractor to separate inspection findings from recommendations. A useful comparison is not just a total or a brand name. It shows whether the bidders have understood the roof condition, included needed repairs, proposed a compatible system, and accounted for site access and maintenance.

Use a comparison worksheet with these categories:

  • Existing condition:

    Are the same areas and defects documented?

  • Scope boundary:

    Is the full roof covered, only selected areas, or only seams and details?

  • Pre-work repairs:

    Are fasteners, flashing, rust, and active leaks addressed?

  • Preparation:

    Are cleaning, drying, and surface treatment defined?

  • Coating system:

    Are product name, primer, reinforcement, and application method listed?

  • Site logistics:

    Are access, protection, runoff, work timing, and operational impacts explained?

  • Exceptions:

    Are inaccessible details, hidden damage, and excluded work identified?

  • Closeout:

    Are product records, completed-work photos, and maintenance directions included?

If one proposal includes a full-surface system and another only treats seams, they are not directly comparable until the difference is understood. Ask why each scope is recommended, what risk it leaves, and what condition would lead to a change in work. Make sure the answer is written into the approved scope where it matters.

Quotes for building projects are based on project-specific variables such as location, condition, engineering, materials, access, and scope. Do not treat a general planning figure or a product price as a final project quote. Metal Buildings of Texas provides a project FAQ and a direct contact path for a free quote for owners ready to discuss their building and goals.

What information should you bring to a contractor?

A focused first conversation saves time and helps the contractor understand whether the question is coating, repair, or a larger roof project. Share the building's location and use, what the roof is made of if known, and the specific concern. Explain when water entry occurs, which areas are affected, and whether the issue appears after wind-driven rain, long rainfall, or another condition. Avoid diagnosing the source before it is inspected.

Useful information includes:

  • Approximate building age and any available drawings or roof documentation.

  • Prior coatings, sealants, repairs, or panel replacements, including products if recorded.

  • Interior and exterior photographs taken safely, with a simple map of problem locations.

  • Observed leaks, moisture, corrosion, ponding, or damage and when each was noticed.

  • Building use, sensitive equipment or inventory, and operating constraints during work.

  • Your primary goal: stop a known leak, assess an aging roof, compare maintenance options, or plan a larger project.

Then ask what inspection is appropriate, what information is still missing, and what decisions need to wait for that inspection. If the building is in East or Central Texas, explain the site location and intended scope; turnkey availability and shell or installation coverage are not identical everywhere. The company's completed project gallery can provide examples of building work, but it should not be taken as a promise that a particular coating or roof outcome applies to your property.

How should the work be sequenced with other building projects?

Roof coating decisions are easier when coordinated with the work that touches the roof, walls, slab, drainage, or utilities. A coating is a finish applied to an existing surface, so other construction activities can damage it or change how water reaches it. Before agreeing to a start date, list nearby work and decide which tasks should happen first.

If roof panels, gutters, wall sheets, or flashing are being repaired, complete the relevant repair scope before the final coating steps when the system requires it. If a new vent, curb, conduit, or equipment support is planned, detail the penetration and its flashing before coating rather than cut through a finished surface later without a coordinated repair. The contractor responsible for each task should know who owns the transition and who will document it.

Site grading and drainage also affect the roof project. If runoff currently collects beside the building or flows toward an entry, plan how water should leave the roof and the site. Cleaning or application work can produce runoff that needs control, while blocked gutters or downspouts can undermine an otherwise sound roof detail. A roof treatment is not a substitute for correcting site drainage, and grading changes should not direct water toward a slab, neighboring parcel, or access route.

For new construction or major renovation, resolve the roof assembly and building use early enough to coordinate structure, insulation, ventilation, penetrations, and interior requirements. Retrofitting a coating onto a roof that has unresolved moisture or condensation concerns may not address the source. The design team should clarify whether the roof is intended to remain exposed, what insulation and ventilation approach is included, and how the roof is expected to manage water.

Where several trades are involved, assign responsibility for temporary protection and final inspection. For example, a coating crew may finish one roof plane before a mechanical contractor installs equipment. The schedule should state how the later work will protect the coating, who will repair accidental damage, and how new penetrations will be sealed. These details are especially important when a business needs to maintain access or protect stored goods during construction.

A sensible sequence often looks like this, adjusted to the actual project:

  1. Document the existing building, roof conditions, and the owner's priorities.

  2. Inspect and determine whether localized repair, coating, or replacement merits further planning.

  3. Resolve design, access, drainage, permits or jurisdictional questions that apply to the selected scope.

  4. Complete structural, panel, flashing, and penetration work that must precede surface preparation.

  5. Prepare and treat the roof in the order required by the chosen product system.

  6. Coordinate any later trade access, protect completed work, and record the final condition.

This sequence is a planning aid rather than a fixed construction schedule. Conditions found during inspection, product cure requirements, weather, and the scope of other work can change the order. Ask the contractor to identify dependencies and decision points before mobilization. That conversation helps prevent the common problem of one crew finishing an area only for another activity to disturb it.

When the work is part of a broader metal building project, one coordinated scope can make accountability clearer. Metal Buildings of Texas describes its approach as construction coordination from site preparation and concrete through steel erection and building completion, with actual scope and service availability determined by project and location. The concrete and sitework information is relevant when roof planning is part of a larger build, but does not replace a site-specific assessment of roof coating suitability.

Frequently asked questions about metal building roof coating

Can a coating stop an active roof leak?

Not reliably by itself. First find the leak source and correct the failed detail using a repair compatible with the roof and proposed coating system. A coating may be part of a broader solution only if the roof condition and product instructions support that approach.

Can you coat any metal roof?

No. Existing finish, corrosion, prior coatings, sealants, panel condition, and product approval all affect suitability. Identify the substrate and follow the specific manufacturer's requirements before selecting a system.

Does a coating eliminate roof maintenance?

No. The roof still needs periodic inspection, clear drainage, and attention to new damage or changes at seams, fasteners, flashing, and penetrations. Follow the product's maintenance requirements and keep a record of the completed work.

Is a reflective coating a substitute for insulation?

No. Reflectance and insulation address different parts of building performance. Comfort also depends on ventilation, air leakage, occupancy, equipment, and the rest of the roof assembly. Evaluate the building as a whole before expecting a coating to change indoor conditions.

Should I coat over an existing coating?

Only if the new product and existing layer are compatible and the old coating is sound enough to serve as a base. The contractor may need to identify the prior product, test adhesion, and remove areas that are loose or unsuitable. Do not assume that a new layer will bond simply because the surface looks intact.

The best coating decision starts with an honest assessment of the existing roof and a clear definition of the work. When preparation, repairs, product compatibility, and follow-up are planned together, Texas property owners can compare coating with repair or replacement on the condition of their own building.